PULL System ( introduce Kanban )

PULL System ( introduce Kanban )

Postby bstan » Thu Jul 02, 2009 3:20 am

Hi...

When introduce KANBAN ( PULL SYSTEM ) in manufacturing line
How to instruct the system to :-

1) Pull the needed Qty base on Kanban qty release from Downstream ?
E.g.: If we have 2-Kanban, then we are allow to Withdraw 2- Work
items from the Storage Bin or from Upstream process.

2) How to Stop to Pull when no kanban produce ?

3) How to maintain the Design Stock level timely in the storage ?
Means: The Storage Bin shall maintain it Work items as design
If 1-Work item been withdraw by Downstream, then it
shall replenish immediately

4) How to design the resources to work base on the work sequence ?
Example: (a) : Go to Work center no: 1 --> 2 --> 3--> 4 --> 5
(b) : Go to Work center no: 5 --> 3 --> 2--> 4 --> 1

Tks in advance